04-11-2007, 04:52 AM
My situation:
I had the bright(?) idea of putting all of my new shack objects into an ESP and removing the definitions from my Ebbedin claim ESP. I immediately ran afoul of load order issues since the new shack ESP was "younger" then the claim ESP. My question is even if I rejigger things to get the load order correct, would these ESPs be of any value for merging into the ST ESM, or should I just bite the bullet and eventually merge the 2 ESPs before handing them over?
Thanks,
Steve
I had the bright(?) idea of putting all of my new shack objects into an ESP and removing the definitions from my Ebbedin claim ESP. I immediately ran afoul of load order issues since the new shack ESP was "younger" then the claim ESP. My question is even if I rejigger things to get the load order correct, would these ESPs be of any value for merging into the ST ESM, or should I just bite the bullet and eventually merge the 2 ESPs before handing them over?
Thanks,
Steve